EasyManuals Logo

GE JVB36 User Manual

GE JVB36
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #13 background imageLoading...
Page #13 background image
Installing the Electrical Wiring
[] MomH a s_anda_d wiring box, wi_h _-p_onged,
120 vdL 60HZ omieL insk]e d_e (abine_
Make sme the downdrafl'g power cord can
[]
[]
Rm_ fl_e appropriate po_ er cable imo fl_e
cabinet an(] (:()nnect it t() the o!]t]et.
Plug tile downdrafl's power cord into tile
omiet.
For tocM Insta#ation
Theconduit orl the blo_xer/3-of suFicierlt /erlgth to connectto
the downdf_fl when the blower is mounted in the cabinet and
for some/rlstallst/ons urlder the floor
Plug die blowe5 conduit into die mating connector
on the bottom of wising con_pmtment covey on the
down(karl, ffasten the vds:ebox to the main refit
wiring comp>wmlem _dth die screws pro@led.
For Remote Installations
If the blower conduit isnot long enoughto reachthe wiHr_q
compar_Tnentorl the dowrldr_lfi,the leadscarlbe extendet_
[] Cm the b]o_er lea(Is ap[)roximate]y 3" fl:om
tile plug on tile end of the b]o_ er 5:on(]uit.
I:)oX,4, _))_x _ 3-Wireconnector
Blowerwife
Blower_ _
{ onduit
[] Remove tile wis:e box and conduit fitfingflom
tile end of tile blo_ es conduit b} loosening tile
screw on tile fitting.
Mountingscrew ___ __o
Wire to outdoor / _J J
enclosure ,__ J jJ
"_ 3-Wire
connectors
Blowerwire box Wirenuts
[]
[]
[]
[]
[]
Saxe the wive box and plug to complete tile
5:onne(fion at the (]own(]_aft vent in the ]louse.
Use electsk:al (able _m(] conne(toFs that
(:onfom_ to local codes ( 14 gmlge rain. is
recommended), Att_wh tile wise box removed
flom die blower conduit to die end of the wis:e
rml at the venL Attach the plug an(] 3" ]ends to
the cable at the (]own(kn_ vent. Insert die plug
into the nlatin_ pbl_ on the re]lit, Attach wile
box _lt]l scsews to the vent.
Install appropriate eles:tvic_dbox sddl conduit
C( 555n e c{ o5"s 55 e f!5" t ]le 1) ] (5we 5",
Ches:k fllat tile 5ed plastic anti-short bushing is
ses:med in file end 5)_tile con(brit. ]install the
1)]o_es csm(]uh into the con(]uit 5:onnectsn on
die eles:{fis:al box.
Att_ch the gseen gsomld lead flom tile blower
to tile groined lead of tile _dfing of tile
(]()wn (]faf_ vent.
[] Connes:t die neutral and })55wetleads flom die
blower t55the leads fl55m the (](5_n(]r:4ft _ent.
Installing the Cooktop
Align the (ooktop with the down(karl and
fhsten ( ooktop in pla(e.
NOTE:Accurate alignment of cooktop and downdraft is
necessary to ensure that there is not interference when
air vent is raised and lowered. There should be a gap of
1/16"- 1/8" between the back of the cooktop and the
front of the downdraf_ cover
/3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE JVB36 and is the answer not in the manual?

GE JVB36 Specifications

General IconGeneral
BrandGE
ModelJVB36
CategoryVentilation Hood
LanguageEnglish

Related product manuals