EasyManua.ls Logo

GE LOGIQ S8

GE LOGIQ S8
127 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Site Preparations
3-20 Ultrasound SystemCommon Service Information
Direction 5444964-100 English
Rev. 5
Probes environmental requirements
Operation and storage temperatures for probes
For probe operation and storage temperature information, refer
the the Ultrasound System or Probe User Manual.
Time and manpower requirements
Site preparation takes time. Begin site preparation checks as
soon as possible, if possible, six weeks before delivery, to allow
enough time to make any changes.
WARNING
For Console Ultrasound systems and for Ultrasound systems
mounted on a Docking/Isolation Cart, have two people
available to deliver and unpack the Ultrasound System.
Attempts to move the Ultrasound system considerable
distances or on an incline by one person could result in injury
or damage or both.

Table of Contents

Other manuals for GE LOGIQ S8

Related product manuals