
Do you have a question about the GE Spectra Series and is the answer not in the manual?
| Brand | GE |
|---|---|
| Model | Spectra Series |
| Category | Industrial Electrical |
| Language | English |
Defines and explains the purpose of warnings, cautions, and notes used in the publication.
Inspecting equipment upon arrival and safe methods for moving and positioning it.
Precautions for storing equipment and key points for safely lifting the equipment.
Study drawings, identify external materials, and check site requirements before installation.
Selecting location, ensuring clearance, rear access, and foundation requirements.
Installing conduits and specific procedures for seismically certified equipment.
Field connection and testing procedures for ground-fault protection systems.
Fuse selection criteria, switchboard inspection, and megohmmeter tests before energizing.
Minimum clearances for live parts, bolt specifications, and grounding bus details.
Using cords for protection and relevant installation considerations.
Procedures for installing main cables, including lashing, and inspection after cabling.
Diagrams for splicing individually mounted sections to other individually mounted sections.
Diagrams for splicing individually mounted sections to group-mounted distribution sections.
Establishing periodic maintenance, keeping records, and following safety practices.
Managing temperatures, loading, short circuits, arcing damage, and water-soaked equipment.
Guidance on ordering spare parts, devices, and obtaining assistance from sales engineers.










