Grasso
Refrigeration Division
GRASSO SYSTEM CONTROL
01.2003/0 638660E_chapter3.doc
3 Initial Start UP 1
3.1 Overview of steps to take for commissioning 1
3.2 Selection of the components installed and sensor scaling 2
3.3 Adjusting control settings 5
3.4 Adjusting operating mode settings 5
3.5 Adjusting limit values 6
3.6 Adjusting time values 6
3.7 Parameterise unit options 6
3.8 Saving changes 7
3.9 Check the compressor unit’s wiring 7