EasyManua.ls Logo

Genasun GVB-8-Pb-36V-WP - Inspection and Maintenance; Annual Inspection Checklist

Default Icon
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Use only copper conductors suitable for a minimum of 60 degrees C. If operation at high power or at high ambient temperatures is
expected, wire with a higher temperature rating may be necessary.
Inspection & Maintenance
Inspect the controller at least once per year to ensure proper performance.
Check for animal or insect damage.
Inspect for corrosion / water damage.
Inspect the security of all connections.
Ensure the solar array does not exceed the maximum input voltage.
Repair and clean as necessary.
Check http://genasun.com for latest manuals.

Related product manuals