EasyManua.ls Logo

Genesis 2 IRON PRO MAX - Pre-Installation Checklist; Important Notice for Installation; Required Operating Conditions

Genesis 2 IRON PRO MAX
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
4. Pre-Installation Checklist
IMPORTANT NOTICE
Read through the instructions thoroughly and obtain all materials and tools before proceeding with the
installation. Be sure to follow all applicable national, state, county and local plumbing codes and regulations.
All plumbing and electrical work should be performed by an accredited professional to ensure all local,
state, and municipal guidelines
are met.
During cold weather it is recommended that the installer warm the valve to room temperature before
operating.
For outdoor installation ensure that system cannot freeze and is protected from direct sunlight and weather
conditions including rain. Outdoor weather cover can be added for additional weather protection of the
control valve. Warranty coverage does not include damage due to weather or acts of God.
Required Operating Conditions
CAUTION
Do not exceed 120 psi water pressure.
Do not exceed 35° C / 125° F water temperature.
Do not subject unit to freezing conditions.
Failure to use this product within the described conditions may void the warranty.
Working Conditions
Working Pressure
20psi 88psi
Water Temperature
35 °F 125 °F
Working Environment
Environment Temperature
35 °F 125 °F
Relative Humidity ≤95%
Power Source 100-240VAC / 50-60Hz
Inlet Water Quality
Turbidity
5 FTU
Hardness
20 grains per gallon
Chlorine
0.1ppm
Iron
2+
0.3ppm
Genesis
2 Iron Pro Max Water Softener and Iron Filtration System Manual

Related product manuals