EasyManuals Logo

Getinge GE 6610 AC-1 User Manual

Getinge GE 6610 AC-1
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
9
Unpacking
Check when unpacking the equipment that the order No. of its data
plate conforms with the ordering No. of the documents.
Check that the sterilizer is faultless. Any transportation damage
should be reported within seven days to the transport company that
was responsible for delivery.
Do not remove the protective plastic film from stainless steel panels
until the installation is completed.
There is certain equipment such as expendable items, control unit,
operating instruction and list of programs by-packed the sterilizer
inside the chamber. The two latter are to be posted where easily
observed by the operator at work.
Storage
The unit must be stored in a temperature between 2 and 40
o
C (35 and
105°F) and at a maximum relative humidity 95% (non-condensing).
Installation
Observe national and local regulations concerning service space.
Make sure that the clearance distances required by health and safety
regulations are provided.
Please note that those articles are adapted for each steril-
izer. When unpacking more than one sterilizer the articles
are not to be interchanged.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Getinge GE 6610 AC-1 and is the answer not in the manual?

Getinge GE 6610 AC-1 Specifications

General IconGeneral
BrandGetinge
ModelGE 6610 AC-1
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals