EasyManua.ls Logo

Gigabyte R262-ZA1 - Installing the Mezzanine Card; Ocp 3.0

Gigabyte R262-ZA1
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 41 - System Hardware Installation
3-7 Installing the Mezzanine Card
3-7-1 OCP 3.0
Use of the following type of OCP 3.0 NIC is recommended:
OCP 3.0 SFF with Pull Tab
OCP 3.0 SFF with Ejector Latch
Follow these instructions to install an OCP 3.0 mezzanine card:
1. Remove the two screws securing the mezzanine card slot cover.
2. Remove the slot cover from the system.
3. Insert the OCP 3.0 mezzanine card into the card slot ensuring that the card is rmly connected to
the connector on the motherboard.
4. Tighten the thumbnail screw to secure the OCP 3.0 mezzanine card in place.
5. Reverse the previous steps to replace the OCP 3.0 mezzanine card.
1
2
1
3
4

Table of Contents

Related product manuals