EasyManua.ls Logo

GILCREST PavMaster 314 - Pick up and transportation procedure

Default Icon
124 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
3) Do not remove paving material from the hopper or auger trough while the paver is
operating. The operator should be advised when adjustments are being made.
4) Do not attempt service or repairs you do not understand or cannot perform competently.
5) Never go between the tuck and the paver.
6) Do not attempt to clean, lubricate or service the paver while it is running.
7) If any safety related defects are discovered, inform the operator to shut the machine
down and correct the defect.
Pick up and transportation procedure
procedure for your truck. The proper chain link to maintain a level and stable condition
should be located and marked permanently with paint or wire. If the truck used to transport
the PavMaster is a short bed vehicle, a small winch should be mounted to the frame of the
truck to secure the bed in the horizontal position.
A trailer is recommended for this function. The transportation of the PavMaster for short
Safety doesn't cost - It saves!
Take time to be safe!!!
When you receive your new PavMaster, you should establish the proper pick up
JMG Equipment Company, does not recommend transporting the
maximum speed of 35 miles per hour is recommended.
PavMaster for long distances while attached to your dump truck. A
distances is described in the above paragraph.

Related product manuals