EasyManua.ls Logo

Global TSUNAMI - On-Deck Mounting & Plumbing Instructions

Global TSUNAMI
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Global Pool Products is committed to engineering and manufacturing world class products in the pool industry
Global Pool Products
1330 Pigeon Rd
Bad Axe, MI 48413 Information contained in this document is proprietary and confidential to
P: 989-269-5900 - TF: 866-712-0606 Global Pool Products and not to be reproduced without
Fax: 989-269-5902 written consent from Global Pool Products.
www.global-poolproducts.com
Page | 20
Optional Lighting Preparation
1. Install 1” conduit next to the water stub-up before concrete is poured.
2. Run the conduit outside of the concrete pool deck to either the pool equipment or junction box.
3. Refer to local building or electrical codes.
ON-DECK MOUNTING & PLUMBING INSTRUCTIONS
Required Tools
½” SDS Concrete Bit Hammer
Hammer Drill Shop-vac
Center Punch (Marking Tool) 4 ¾” Hole Saw (for garden hose hook-up option)
Included Hardware
½” Concrete Anchors
Front pedestal needs to be installed on a surface with 0 grade to prevent water wicking back onto pool deck.