EasyManua.ls Logo

Glow-worm 18sxi - Installation Preparation

Glow-worm 18sxi
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17 0020008155A
Diagram 6.1
6.1 Appliance Pack
IMPORTANT: With regards to the Health and Safety Manual
Handling requirements, two persons shall be required to lift the
appliance, refer to manual handling on page 5.
Please check the contents of packs as shown in diagram 6.1.
NOTE: The fixing pack is located in the base polystyrene
packing under the boiler base.
Remove the polystyrene end packing pieces then carefully lay
the boiler on its back, remove the two front casing panel
securing screws and lift off the panel from two retaining lugs.
Remove the transit packaging behind the front panel and
discard.
Carefully place front panel and screws to one side.
6 Installation Preparation
12346

Related product manuals