Diagram 13.7
13 Servicing
13272
Diagram 13.8
13.4. Combustion Chamber and Heat
Exchanger
Remove loose debris from inside the combustion chamber
using a soft brush and vacuum cleaner.
Carefully ush by spraying water into the heat exchanger, any
remaining debris should pass through the condensate trap
(Ensure the water is kept away from electrical components).
13.5 Inner Casing Panel Seal check
Check the condition of the seal, if worn or damaged remove
the seal and thoroughly clean the casing surface before tting
the new seal, see diagram 13.8.
Ret the inner casing panel.
NOTE: Ensure the seal is tted correctly giving an airtight
joint.
13.6 Service Completion
Re-check the combustion as described at the beginning of
this section.
On completion of the service the “Benchmark” Service Record
should be completed.

Other manuals for Glow-worm 38cxi

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm 38cxi and is the answer not in the manual?

Glow-worm 38cxi Specifications

General IconGeneral
Model38cxi
CategoryBoiler
Output38 kW
Efficiency89.2%
Efficiency RatingA
ERP RatingA
Fuel TypeNatural Gas
MountingWall Mounted
Max. Working Pressure3 bar
Electrical Supply230V ~ 50Hz
Flow Rate at 35°C Rise15.7 litres/min
Central Heating Flow Temperature Range30°C to 80°C
TypeCondensing Combi Boiler
Flow Rate15.7 litres/min at 35°C rise