EasyManua.ls Logo

Graco Ultra 1000 - Page 23

Graco Ultra 1000
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
307–785
BRIDGE TEST
Remove the bridge from the pressure control box and
perform this test to determine if the bridge is functional.
Refer to BRIDGE RECTIFIER REPLACEMENT, page
27. Use a continuity tester , such as multi–meter set on
the
X1 ohms scale.
Perform
all tests in the chart. If the bridge fails even one
test,
it must be replaced.
Fig 23–1 shows the position of the wires on the bridge.
Using the chart at the right, connect the meter wires as
indicated
by the black dots for each test,
and then check
the
continuity
.
Fig 23–1
AC1
AC2 G2
G1
+
In T
ests 1, 2 and 3, there should be NO continuity
.
In Tests 4, 5 and 6, connect the + and – meter wires as
indicated, check continuity , then switch the meter wire
connections
and check continuity again. Y
ou should get
NO
continuity one way and YES continuity the other way
.
In
T
ests 7 and 8, connect the meter wires as indicated by
the black dots. T
ouch the indicated “G” wire to one meter
wire,
and
then to the other
. Y
ou should get NO continuity
one
way and YES continuity the other way
.
NO TEST
1
NO 
TEST 2
NO
TEST 3
YES 
NO 
YES 
NO 
YES 
NO 
YES 
NO
YES

NO
BRIDGE
WIRES
G2 G1 + AC1 AC2
OR
OR
TEST
5
TEST 6
TEST 4
TEST 7
TEST 8
CONTINUITY

Other manuals for Graco Ultra 1000

Related product manuals