Gree GMV6 DC Inverter VRF Units Service Manual
3.1.2 Files
To record the installation and commissioning of the unit, all the following documents need to be
prepared: minutes of the pre-commissioning scheme determining meeting, commissioning personnel
record form, pre-commissioning checklist, commissioning data record form, and commissioning report.
Minutes of the commissioning scheme determining meeting:
Minutes of the commissioning scheme determining meeting for XXX project:
Checklist of the commissioning system appearance:
Checklist of the equipment appearance of xxx air-conditioning project
Item Defect Inspector Time
Refrigerating
system
Drainage system
water pipe
Electrical system
Communication
system
Communication
cable material
cable