●Put the valve in a proper 
position.   
●
Weld the valve with the 
pipeline. 
 
●Before welding, cover the valve 
with wet cloth to avoid internal 
slide from being burnt and 
prevent water from flowing in the 
pipeline.   
●During welding, charge 
nitrogen into the pipes. The 
pressure should be controlled 
within 0.5±0.1 kgf/cm2 (relative 
pressure). 
●Check various parts and 
connecting lines.   
●
If no problem is found, hook 
the front panels and tighten the 
screws.