Gree                GMV6 DC Inverter VRF Units Service Manual 
 
 
In step “8 Compressor preheating confirmation”, the current preheat time is directly displayed, as 
shown in the red box in the figure below. If the system currently detects that all the basic modules have 
been continuously powered on for 2 hours or more, or the previous time when the modules were powered 
on for 2 hours or more is less than 2 hours from the current time, preheat is completed and the system 
can proceed to the next process. Otherwise, the system prompts UO (insufficient compressor preheat 
time).