EasyManuals Logo

Gree GMV-80WL/C-T User Manual

Gree GMV-80WL/C-T
173 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
GREE DC Inverter Multi VRF System II Service Manual
44
z During debugging, a click on “Break” can stop debugging. Click “Start” to resume debugging and
then debugging will be finished step by step. For No.10 ODU Valves Check Before Startup, there
are “Back” and “Skip” buttons. If there is error in this step, you can back to step No.9 and click “OK”
to restart debugging on step No.10. If the error in step No.10 is U6 error (valve error alarm), you can
click “Skip”. In other cases, “Skip” button is null.
z Step 11, 13 and 14 are reserved steps. And step 13, 14, 15 and 16 are steps in parallel (only one of
the four will be selected according to actual needs).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-80WL/C-T and is the answer not in the manual?

Gree GMV-80WL/C-T Specifications

General IconGeneral
BrandGree
ModelGMV-80WL/C-T
CategoryAir Conditioner
LanguageEnglish

Related product manuals