EasyManua.ls Logo

Gree GWH18YE-S6DBA2A/O - Page 114

Gree GWH18YE-S6DBA2A/O
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
111
Installation and Maintenance
Service Manual
Step Procedure
6. Remove vertical louver
Loosen the connection clasps between vertical
louver and bottom case to remove vertical louver.
7. Remove shield cover of electric box sub-assy
Loosen the connection clasps between shield
cover of electric box sub-assy and electric box, and
then remove the shield cover of electric box sub-
assy.
8. Remove electric box assy
Remove Wiring terminal of motor and step motor,
and then remove the screw xing electric box assy
and then remove the electric box assy.
9. Remove connection pipe clamp
At the back of the unit, remove the screw fixing
connection pipe clamp and then remove the
connection pipe clamp.
Clasps
Vertical louver
Shield cover of electric box sub-assy
ScrewConnection pipe clamp

Other manuals for Gree GWH18YE-S6DBA2A/O

Related product manuals