EasyManua.ls Logo

Gree JKFD5QSR/Na-E - Page 82

Gree JKFD5QSR/Na-E
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE Air-ccoled Closed Control Unit Service Manual
79
Click Main Menu->Control->Link an equipments the system will start checking
according to saved connection. Related parameter will be displayed if the communication is
normal.
Click Main Menu->Control->Break to open a conjunction
, the system will stop
monitoring to all the equipments.
4.4.2 Project information
Before monitoring, users have to select a project. Click Main Menu->System->The
engineering install and the following interface will show. Fill in the project information, click
“update” and “OK” to confirm.
4.4.3 Installation information configuration
Unit name: normally refer to the places where the AC installed, like “living room”,

Table of Contents

Related product manuals