EasyManua.ls Logo

Greenlee G3 - Boom Setup

Greenlee G3
19 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
G3 Tugger
®
System
Greenlee / A Textron Company
10
Boom Setup
1. Place puller in approximate position of conduit.
2. Align nose with conduit and lock it in place with long
detent pin.
3. Butt nose up against conduit threads and conduit
locking nut. Place clamping plate inside of conduit
and tighten knurled nut. Take lock nut off temporar-
ily for more thread engagement if needed.
4. If the conduit is free standing or without threads,
position the nose so that the conduit will butt up
against the ats of the clamping plate.
www.GlobalTestSupply.com
Find Quality Products Online at: sales@GlobalTestSupply.com