East Bethel, MN USA 763-753-7374
6
Post Cap Assembly
5
Bottom Board and Fabric Installation
Place one 31-7/8” x 5-1/2” corner notched bottom board (Item 5) on
each end of the garden bed.
Place six 31-7/8” x 5-1/2” bottom boards (Item 6) into the garden bed.
(Gap boards evenly to allow for water drainage).
Install fabric liner into the planter box.
Soil Capacity: 5.4 Cubic Feet
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 7) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
3
End Rail Assembly
Install two 31” x 5-1/2” side rails (Item 4) into the upper part of the
slots on the two corner posts and slide down to the bottom of the slots.
4
4
4
Final Side Rail Assembly
Install two 45” x 5-1/2” side rails (Item 3) (one with logo) into the slots on
each side of the garden bed and slide down. (Side rail with Logo located
to outside).
Install two 31” x 5-1/2” side rails (Item 4) into the slots on each end of
the garden bed and slide down.
4
3
3
4
Logo
5
6
Rubber Cap
Stud
7