Step 1
Connecting the equipment
Securely mount controller on a wall at plant level.
Connect one end of the detachable power cord into a 120 V outlet and the
second end into the power input connector on the left side of the
controller .
The controller warms up for 30 seconds before displaying a valid CO
2
reading.
Plug the CO
2
generator into the 120V outlet also on the left side of the
controller .