EasyManuals Logo

GSi 2000 Series Installation Instructions

GSi 2000 Series
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #46 background imageLoading...
Page #46 background image
4. Electrical Power Supply
46 PNEG-900 Series 2000 Autoflow Fan/Heater and Control Installation Instructions
Autoflow to Fill System Control Box Interconnect
The fill system control box houses the starter(s) for the fill system(s) that load grain into the Top Dry
Autoflow unit and for the aeration fan. DO NOT run the control wires for the fill system control box in the
same conduit used for the power wires for the fill system and aeration fan motors. To wire the fill system
control to the Autoflow control box do the following.
1. Run eleven (11) control wires from the Autoflow control box to the fill system control box.
2. Connect the wires as shown in Figure 4J.
Figure 4J

Table of Contents

Other manuals for GSi 2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GSi 2000 Series and is the answer not in the manual?

GSi 2000 Series Specifications

General IconGeneral
BrandGSi
Model2000 Series
CategoryFarm Equipment
LanguageEnglish

Related product manuals