EasyManua.ls Logo

H3C S5120V2-LI

H3C S5120V2-LI
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
H3C S5560S-SI & S5500V3-SI &
S5130S-SI[LI] & S5120V2-SI[LI] &
S5110V2-SI & S5000V3-EI &
S3100V3-SI Switch Series
Installation Guide
H3C S5560S-SI Switch Series
H3C S5500V3-SI Switch Series
H3C S5130S-SI Switch Series
H3C S5130S-LI Switch Series
H3C S5120V2-SI Switch Series
H3C S5120V2-LI Switch Series
H3C S5110V2-SI Switch Series
H3C S5000V3-EI Switch Series
H3C S3100V3-SI Switch Series
New H3C Technologies Co., Ltd.
http://www.h3c.com
Document version: 6W104-20190731

Table of Contents

Questions and Answers:

H3C S5120V2-LI Specifications

General IconGeneral
ModelH3C S5120V2-LI
MAC Address Table Size16K
VLAN Support4K VLANs
Storage Temperature-40°C to 70°C
Operating Humidity10% to 90% (non-condensing)
Storage Humidity5% to 95% (non-condensing)
Switching Capacity176 Gbps
Jumbo Frame9KB
Power SupplyAC 100-240V
Dimensions (W x D x H)440 mm x 260 mm x 43.6 mm
Operating Temperature0°C to 45°C

Summary

Preparing for Installation

Safety and Site Requirements

Covers safety guidelines, site examination, environmental conditions, and laser safety.

Installing the Switch

Rack Mounting Procedures

Guides on installing the switch in a 19-inch rack, including bracket selection and attachment.

Grounding and Power Connection

Essential steps for grounding the switch and connecting power cords.

First-Time Switch Access

Accessing via GUI

Instructions for accessing and managing the switch via its web-based Graphical User Interface.

Accessing via CLI

Methods for accessing and configuring the switch using the Command Line Interface.

Setting Up an IRF Fabric

IRF Configuration and Connection

Configuring basic IRF settings, connecting physical ports, and verifying the fabric.

Maintenance and Troubleshooting

Appendix C: Ports and LEDs

Related product manuals