3
Installing the AP
Installation flowchart
Figure 3 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
• Connect the AP to a power source and the network. Examine the LEDs to verify that the AP
operates correctly. For information about AP LEDs, see "LEDs."
• Record the MAC address and serial number at the rear of the AP for future use.
• Make sure you have completed cabling at the installation site.
Determining the installation position
Determine the installation position by observing the following principles:
• Few obstacles such as wall exist between the AP and clients.
• The AP is far away from electronic devices (such as microwave oven) that might generate
radio frequency (RF) noise.
• The AP does not hinder people’s daily work and life.
• The place is not water seeping, water soaking, and condensing.
Determine the
installation method
Mount the wall/ceiling
bracket to a wall
Mount the wall/ceiling
bracket to a ceiling tile
Install the AP
Connect the power cord
Start
Connect the AP to the
network
Pre-installation tasks
Ceil-mount Wall-mount
End