SECTION 3: INSTALLING THE LIFT KIT
*  On machines with eyebolt through holes, remove the eyebolt plugs on the base casting.
1. Install the two 1 
1
/
8
- 7 eyebolts to the base casting as shown below and tighten.  Eyebolts should
be facing towards the front of the machine when tightened.
Fig. 3-1     Eyebolt and position access hole for VF-6 thru 10.
2. These specifications are an approximation of the weight distribution and chain length needed
to lift the VF-6 thru 10.
Fig. 3-2     VF- weight specifications.