EasyManua.ls Logo

Haier AD140S2SM3FA - Page 172

Haier AD140S2SM3FA
257 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
169
Test Run
Relocation Procedures
Please call the dealer or the appointed agency.
Follow the following procedures:
Note: in case relocation is required, the joint of evaporator gaslliquid pipes of the indoor unit shall be cut off with a
cutting knife.Connection is only allowed after re-aring (the same to the outdoor unit).
1. Preparations
(1) Check the power supply.
(2) Check the equipment around, whether there is any combustible source, re source, or heat source.
(3) Power on is not allowed before all the installation operations are completed and before the leak detection is
proven qualied.
(4) The control circuit shall be connected correctly and all the wires shall be rmly connected.
(5) The two-way stop valve and three-way stop valve shall be opened.
(6) All the scattered articles (especially the metal ling and thread residue) shall be removed from the unit body.
2. Methods
(1) Switch on the power supply and press the "ON/OFF" on the remote controller, after which the air conditioner will
start operating.
(2) Press "Mode"to select refrigeration, heating and sweeping wind, and observe whether the air conditioner is
under normal operation.
Inspection on system leakage prior
to disassembly
Safety discharge of refrigerant
Safety discharge of refrigerant
Refrigerant recovery by the system
Cleaning of the indoor unit and
connecting pipes with inert gas
Installat on as requ red in standards
Disassembly
Disassembly
Disassembly
Inspection on operational state

Other manuals for Haier AD140S2SM3FA

Related product manuals