26
The slope of water drain hose (1) shall be within 75mm, don't apply too much force on it.
If several water hoses join together, do as per following proceedures.
Specieations of the water hoses shall meet the requirements for the unit running.
Note:
(2) Check if water drainage is smooth after installation.
• Check whether indoor unit is horizontal with leveler or polythene pipe
lled with water, and check that the dimension of the ceiling opening is
correct. Take off the lever gauge before install the ornament panel.
• Fasten the screws to make the height difference between the two
sides of indoor unit less than 5mm.
• First x it with screws temporally.
• Fasten the two temporally xing screws and other two, and tighten the
four screws.
• Connect the wires of synchro-motor.
• Connect the wire of signal.
• If no response of remote controller, check whether the wiring is
correct, restart remote controller 10 seconds after shut off power supply.
• Install the panel board in the direction shown in the gure. The
incorrect direction will result in water leakage, meanwhile swing and
signal receiving are displayed that cannot be connected.
• Charge, through air outlet or inspecting hole, 1200ccd water to see
water drainage.
• Check water drainage in cooling operation.
<Limits of Panel Board Installalion>
After Wiring