Connection of Refrigerant Pipe
Creating Vacuum
Open All Valves
Gas Leakage Detection
Insulation Treatment
Over lling or underilling of refrigerant will cause compressor fault. The amount of the added refrigerant shall be as 
specied in the instructions.
Connecting Installing Torque (N-m)
φ6.35 11.8 (1.2 kgf-m)
φ9.52 24.5 (2.5 kgf-m)
φ12.7 49.0 (5.0 kgf-m)
φ15.88 78.4 (8.0 kgf-m)
Conduct ared connection work to connect all 
refrigerant pipes.
• The connection of indoor unit pipes must use
  double spanners.
• The installing torque shall be as given in the
  following table.
• Wall thick ness of connection pipe≥0.8mm
With a vacuum pump, create vacuum from the stop valve of the outdoor unit. Emptying with refrigerant sealed in 
the outdoor unit is absolutely forbidden.
Open all the valves on the outdoor unit.
Check with a leakage detector or soap water if there is gas leakage at the pipe connections and bonnets.
Conduct insulation treatment on both the gas side and liquid side of pipes respectively.
During cooling operation, both the liquid and gas sides are cold and thus shall be insulated so as to avoid dew 
generation.
• The insulating material at gas side shall be resistant to a temperature above 120
°
C
• The indoor unit pipe connection part shall be insulated.