EasyManua.ls Logo

Haier AU08NFKERA User Manual

Haier AU08NFKERA
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation Manual for Outdoor Unit
AU08NFKERA
AU10NFKERA
AU12NFKERA
No. 0150543934
• Please read this manual carefully before using.
• Keep this operation manual for future reference.
Original instructions
Question and Answer IconNeed help?

Do you have a question about the Haier AU08NFKERA and is the answer not in the manual?

Haier AU08NFKERA Specifications

General IconGeneral
BrandHaier
ModelAU08NFKERA
CategoryAir Conditioner
LanguageEnglish

Summary

Safety

Installation Prerequisites

Before Installation Checks

Verify model, power, pipes, wires, and parts before commencing installation.

Installation Place Selection

Guidelines for choosing the optimal location for the outdoor unit.

Transportation and Hoisting

Instructions for safely moving and lifting the outdoor unit.

Core Installation Procedures

Outdoor Unit Installation

Procedures and space requirements for outdoor unit placement.

Refrigerant Pipe Connection

Detailed steps and specifications for connecting refrigerant pipes.

Leakage Test Procedure

Methodology for conducting a leakage test on the refrigerant system.

System Evacuation

Process to remove air and moisture from the refrigerant system.

Refrigerant and Oil Charging

Instructions for charging additional refrigerant and oil.

Electrical Wiring and Connections

Outdoor Power Source and Cable

Specifications for outdoor unit power supply and cable requirements.

Indoor Power and Communication Wiring

Requirements for indoor unit power and communication wiring.

System Setup and Debugging

Search Indoor Units

Procedure for locating and configuring indoor units.

Troubleshooting: Failure Codes

Outdoor Unit Failure Code Table

List and definition of various failure codes for the outdoor unit.

Performance Testing and Operation

Protection Devices

Explanation of safety protection mechanisms like the high pressure switch.

Trial Operation Procedure

Steps and considerations for performing the initial unit operation test.

Disposal and Moving Guidelines

Related product manuals