EasyManua.ls Logo

Haier R Series - Page 70

Haier R Series
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installations
67
Domestic Air Condition
3.power block installation
There are two terminal blocks F and G on the full energy recovery exchanger.
F block is power phase string and controlling block, which connects with
power string. G block is the ground-connecting block, which connects the
zero string end in the terminal box.
caution:
There is anti-water jacket(pyroshrink pipe) on the block connector of
the controling string and the power phase string. Please confirm whether
it is fastened after connecting.
F
G
power phase string and
controling block,with
pyrocondensation jacket pipe
grouding block
pyroshrink insulation
jacket
HSU-09,12H03/R(QXF)

Related product manuals