EasyManua.ls Logo

Hallberg-Rassy HR 310 - A Short List for Winter Preparation; Winterization Checklist

Default Icon
61 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
59
A short list for winter preparation
Water tanks Empty by pump
Water pipes Drain at low point
Water pumps Remove hose connection, run dry.
Water filter Open and drain
Water heater See the manual from the water heater manufacturer
Shower mixer Remove and dismantle
Washing machine Remove inlet hose and drain plug
Dish washer Remove inlet hose and drain plug
Toilets Remove drain plug, pump dry
Water maker Remove the membrane unit and store free from frost
For drainage of pump and filters see the manual.
Deck shower See shower mixer
Sea water pump and pipes Pump dry, drain
Engine and generator See manufacturers manuals
Batteries Best left on board. Check the level in all cells.
Charge to full capacity after filling and remove the leads.
Heater Run well before closing down and first thing in
the spring
All ball valves, sea intake Open to avoid trapping water in valve
and drains
Ventilation Provide good ventilation during lay up time also in lockers etc.

Related product manuals