EasyManua.ls Logo

HAMPTON BAY OFW148S - Page 6

HAMPTON BAY OFW148S
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Installation (continued)
4. Turn base assembly (from Step 3) right side up. Set slate top (E) on
top of assembly and align predrilled holes in each corner. Insert one
M6x12mm bolt (AA) in each set of holes and tighten with Phillips
screwdriver.
5. Align the triangular air vents (D) with predrilled holes in re bowl (C).
Insert one M6x12mm bolt (AA) in each of the six holes and tighten with
Phillips screwdriver.
6. Adjust levelers (I) by screwing clockwise to shorten or screwing
counter-clockwise to lengthen. Adjust each of the four corners so that
the fire pit sits level and stable.
4
E
AA
6
I
5
C
D
AA

Related product manuals