EasyManua.ls Logo

HANGCHA Mini Range CDD12-A2MJ-SZ - Loading and Unloading Operations

HANGCHA Mini Range CDD12-A2MJ-SZ
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
– Raise the loads several centimeters to make sure if the loads are firm.
– Travel the truck off the area.
– Drop the load to lower position.
7.8 Unloading
Procedure:
– Approach the deposit area.
– Raise the loads to correct height.