EasyManua.ls Logo

Harris XL Series - 4.2 BEFORE FIRST USE; 4.3 POWER ON AND SET VOLUME; 4.4 VIDA ID

Default Icon
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14221-1850-4000
27
6.2 PRE-INSTALLATION VEHICLE CHECK
Performing a vehicle pre-installation equipment check provides a vehicle operation baseline prior to
installing Harris mobile equipment. This pre-check can be documented using the sample Installation
Checklist provided later in this manual (see Section 15).
The performance of the pre-check may require a certified operator.
The items to be checked are detailed on the Installation Checklist. Check all items and indicate results on
the checklist, or enter “n/a” or “not applicable” if the vehicle does not have it. Clearly record any items
that are non-functional and any servicing that must be completed before the install can begin. Bring these
to attention of the authorized customer representative.
6.3 PLANNING THE INSTALLATION
Carefully plan the mounting locations of all components (radio, Control Head, antenna, and cables) and
determine the routes for all wiring and cables.
NOTE

Other manuals for Harris XL Series

Related product manuals