APC (clS Mode) Technical Analysis
System repeats APC every cooling cycle time (cPr). In a power outage, (cPr) will continue from
the last recorded time. Example: If there is a 1 hour power cut, the next cooling time will delay
about 1 hour. Remaining time to next cooling can be checked by the controller (See Page 12).
“Cooling for a set (clS)” mode parameters
Cooling set point °C (set - adjusted data)
Cooling set point °F (set - adjusted data)
Waiting time in cooling set point
Max humidity during humidification*