EasyManua.ls Logo

Havener Enterprises e40 - Assembly and Setup Procedures

Havener Enterprises e40
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Assembly
NOTE: Reference to Left or Right side of the machine is from the operator’s position at the handle, facing forward.
The edger, except the handle and throttle control is fully assembled, packed and shipped in one carton.
Attaching The Handle
1. Align the top handle, lower support and handle brace holes. Ensure the name plate is facing the engine.
Leave bolts loose until steps 2 and 3 are completed. Attach handle assembly to edger frame, handle brace
using all eight bolts and nuts (Fig 1, 2 and 3)
2. Install control rod into lower pivot hole and secure with hairpin cotter. (Fig. 4). Oil swivel pivots
lightly before installing rod.
Figure 1
Figure 2
Top
Handle
Handle
Brace
Lower
Support
Attach handle to
edger frame
Swivel Pivot
Figure 3
Figure 4