EasyManua.ls Logo

HBM 1-RTN/M2LAR2.2T - User Manual

HBM 1-RTN/M2LAR2.2T
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
RTN/M2LBR / RTN/M2LB
RTN/M2LAR / RTN/M2LA
A1867-2.0 en/de/fr/es
Weighing modules
Wägemodule
Modules de pesage
Módulos de pesaje
RTN/M2...
Mounting Instructions
Montageanleitung
Notice de montage
Instrucciones de montaje
Question and Answer IconNeed help?

Do you have a question about the HBM 1-RTN/M2LAR2.2T and is the answer not in the manual?

Summary

Safety Notes

General Dangers from Non-Observance

Dangers arising from incorrect installation or operation by untrained personnel.

Residual Dangers and Symbols

Explanation of residual dangers and symbols used in the instructions (Caution, Note, CE mark).

Mounting Preparation

Site Preparation and Alignment

Ensuring clean, level areas, rigid foundations, and aligned mounting bores for proper installation.

Load Distribution and Height Adjustment

Achieving even load distribution and correct height level at bearing points using spacer plates.

Mounting Procedures

Avoiding Shock Loads During Fitting

Caution against shock loads when lowering the tank onto bearing points to prevent damage.

Mounting the Load Cell

Procedure for replacing the dummy with the actual load cell after module mounting.

Mounting Load Cells (up to 4.7 t)

Step-by-step guide for mounting load cells on 4.7 t capacity modules, including anti-liftoff and stops.

Mounting Load Cells (10 t to 33 t)

Step-by-step guide for mounting load cells on 10 t to 33 t capacity modules.

Specifications

RTN;M2 LA Specifications (Rubber-metal)

Detailed technical specifications for RTN/M2LA modules with rubber-metal bearing.

RTN;M2 LB Specifications (Pendulum)

Detailed technical specifications for RTN/M2LB modules with pendulum bearing.

Summary

Safety Notes

General Dangers from Non-Observance

Dangers arising from incorrect installation or operation by untrained personnel.

Residual Dangers and Symbols

Explanation of residual dangers and symbols used in the instructions (Caution, Note, CE mark).

Mounting Preparation

Site Preparation and Alignment

Ensuring clean, level areas, rigid foundations, and aligned mounting bores for proper installation.

Load Distribution and Height Adjustment

Achieving even load distribution and correct height level at bearing points using spacer plates.

Mounting Procedures

Avoiding Shock Loads During Fitting

Caution against shock loads when lowering the tank onto bearing points to prevent damage.

Mounting the Load Cell

Procedure for replacing the dummy with the actual load cell after module mounting.

Mounting Load Cells (up to 4.7 t)

Step-by-step guide for mounting load cells on 4.7 t capacity modules, including anti-liftoff and stops.

Mounting Load Cells (10 t to 33 t)

Step-by-step guide for mounting load cells on 10 t to 33 t capacity modules.

Specifications

RTN;M2 LA Specifications (Rubber-metal)

Detailed technical specifications for RTN/M2LA modules with rubber-metal bearing.

RTN;M2 LB Specifications (Pendulum)

Detailed technical specifications for RTN/M2LB modules with pendulum bearing.

HBM 1-RTN/M2LAR2.2T Specifications

General IconGeneral
BrandHBM
Model1-RTN/M2LAR2.2T
CategoryAccessories
LanguageEnglish

Related product manuals