EasyManua.ls Logo

Heathkit IM-16 - Page 14

Heathkit IM-16
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
@
nu*"tt
CONTROL
NUT
CONTROL FLATWASHER
()
()
()
()
HALF
OF
PLASTIC GROMMET
HALF
OF
PL ASIIC
GROMMET
Detqil
6c
Secure
the
subpanel
to
the
front
panel
with
a
control flat
washer and a
control nut
on
each
switch
bushing as shown in
Detail
6D.
Strip
1-1,/2"
of
insulation from
a
piece
of
hookup
wire and
place
this insulationonone
lead of
the neon
pilot
lamp.
Insert
the
pilot
lamp
into the
pilot
lamp
Iens at
F.
Then
connect
the insulated
lead
to lug
1
(NS)
and
the
otherleadto
lug 2
(NS)
of
terminal strip
A.
Prepare
the following six
lengths of
hookup
wire by first cutting
each wire
to the
indi-
cated
length,
and then removing
L/4" of.
in-
sulation
from
each end.
The wires are
listed
in the
order
in
which they will be used.
TCH BUSHING
Detqil
6D
(
)
Connect
a
4"
hookup wire
from lug 2
of
phone
jack
G
(S-1)
to
switch
L2-5
(S-1),
NOTE:
In
the following
steps,
only
one
end
of
each hookup wire will be connected.
Eaeh
step
will
call out
the wire length, the switch lug,
and soldering
instruction.
(
)
2-L/2"
wire to L3-1
(S-1).
Be sure
to
solder
the wire
to
both
the front
and rear
lugs on
wafer
3,
(
)
3"
wire
to L3-6
(NS).
(
I
g-t/+"
wire to L2-12
(S-1).
(
)
3-L/2"
wire
to L2-10
(S-2).
(
)
Position
the
wires toward
the rear of
the
switch.
[j',,'l
3tt
3-L/4"
3-L/2"
(
)
Connect
a
4"
hookup
wire
from lug 1
of
phone
jack
G
(NS)
to lug 2
of control
J
(NS).

Related product manuals