EasyManua.ls Logo

Heraeus HS 12 - Page 80

Default Icon
282 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Instructions HERAsafe HS/12/18
Valid: 05.2001 / 50060091 / A 51
B7 Airflow pattern test
C. Work opening edge retention test:
1. Test method, Fig. B7: Outside the front side of
the cabinet, pass a smoke tube from one end of
the work opening to the other at a distance of 4
cm (1.5 in), pay particular attention to the edges
and corners of the work opening.
2. Acceptance according to NSF, Annex A: No
smoke escapes through the work opening, or is
drawn to the work surface or billows over the work
area.
D. Front window and upper edge seal test:
1. Test method, Fig. B8: From inside, pass a
smoke tube along the window frame seals and
along the upper edge of the front window.
2. Acceptance according to NSF, Annex A: No up-
ward refluxing, nor escape of smoke from the
safety cabinet.
.
Troubleshooting:
Refluxing and dead spots in the airflow:
Check the set point of inflow and downflow air.
Replace the window.
B Field tests
Figure B7 / B8
Fig. B7, Work opening edge retention test
Fig. B8, Front window and upper edge seal test

Related product manuals