EasyManua.ls Logo

Hilti HIT-RE 500 V3 User Manual

Hilti HIT-RE 500 V3
40 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
qr.hilti.com/
manual/?id=439642
Hilti HIT-RE 500 V3
Deutsch
English
Dansk
Svenska
Norsk
Suomi
Eesti
Latviešu
Lietuvių
Polski
Čeština
Slovenčina
Magyar
Slovenščina
Русский
Български
Română
(A, B) (A, B) (A)
DANGER
Contains: 2,2’-[(1-methylethylidene)bis(4,1-phenyleneoxymethylene)]bisoxirane (A);
Butanedioldiglycidyl ether (A); 2-methyl-1,5-pentanediamine (B);
m-Xylylenediamine (B)
Causes severe skin burns and eye damage. (A, B); May cause an allergic skin
reaction. (A, B); May cause respiratory irritation. (B); Toxic to aquatic life with long
lasting effects. (A, B)
Question and Answer IconNeed help?

Do you have a question about the Hilti HIT-RE 500 V3 and is the answer not in the manual?

Hilti HIT-RE 500 V3 Specifications

General IconGeneral
Seismic loadingYes
Strength classHigh strength
PackagingFoil pack
Chemical baseEpoxy resin
Temperature range-5°C to +40°C
Cure time24 hours at 68°F (20°C)
Base materialConcrete
Approvals / Test ReportsETA, ICC-ES
Cleaning proceduresPlease refer to the HIT-RE 500 V3 Instruction for Use
Storage and transportation temperature - min41 °F
Storage and transportation temperature - max77 °F
Tensile strengthPlease refer to the HIT-RE 500 V3 Instruction for Use
ApplicationAnchoring
Safe working temperature range41°F to 104°F (5°C to 40°C)

Summary

Hazard Information and Chemical Composition

Hazard Pictograms and Safety Warnings

Details hazard symbols, chemical components, and associated risks like skin burns and allergic reactions.

Anchor System Installation Specifications

Curing Times and Temperature Guidelines

Curing Time Data by Temperature

Details working time and curing times (initial and full) at various temperatures, presented in both Fahrenheit and Celsius.

Installation Procedures for Anchors

Rebar Installation Guide

Step-by-step visual guide for installing rebar anchors, including drilling, cleaning, and injection.

HIS-N Anchor Installation Guide

Visual instructions for installing HIS-N anchors, covering drilling, cleaning, and adhesive dispensing.

Dispensing Tool Application Procedures

Adhesive Application and Cleaning Process

Specific Installation Scenarios (6.1 & 6.2)

Additional Installation Scenarios (6.3 & 6.4)

Critical Safety Warnings and Handling Precautions

Improper Handling and Eye Protection

Warns about mortar splashes, eye damage, and mandates wearing safety glasses and gloves during handling.

Borehole Cleaning and Load Value Failure

Emphasizes dry boreholes and proper cleaning to prevent load value failures, detailing the use of Hilti accessories.

Consequences of Non-Compliance

Highlights that failure to follow setting instructions can lead to fastening point failure.

Related product manuals