Do you have a question about the Hilti HIT-RE 500 and is the answer not in the manual?
Instructions for drilling boreholes for rebar installation.
Procedures for cleaning bore holes for rebar installation.
Instructions for drilling boreholes for post-installed rebar.
Steps required before mortar injection.
Procedures for cleaning bore holes for post-installed rebar.
Method for calculating tensile resistance for rebar.
Base tensile resistance values for rebar.
Calculations for combined pull-out and cone resistance for rebar.
Concrete cone resistance values for rebar.
Base shear resistance values for rebar.
Injection method for shallower bore holes.
Instructions for drilling boreholes for rebar installation.
Procedures for cleaning bore holes for rebar installation.
Instructions for drilling boreholes for post-installed rebar.
Steps required before mortar injection.
Procedures for cleaning bore holes for post-installed rebar.
Method for calculating tensile resistance for rebar.
Base tensile resistance values for rebar.
Calculations for combined pull-out and cone resistance for rebar.
Concrete cone resistance values for rebar.
Base shear resistance values for rebar.
Injection method for shallower bore holes.
| Cartridge Volume | 330 ml, 500 ml |
|---|---|
| Base Materials | Concrete |
| Approvals / Test Reports | ETA, ICC |
| Seismic loading | Suitable for seismic applications |
| Material composition | Epoxy resin |
Loading...