EasyManua.ls Logo

Hitachi RAS-8FSXNS2E User Manual

Hitachi RAS-8FSXNS2E
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION &
OPERATION
MANUAL
SET FREE SERIES
PMML0628 rev.0 - 05/2023
MODELS
RAS-(8-96)FSXNS2E - air365 Max
RAS-(5-54)FSXNP2E - air365 Max Pro
Heat pump system
Heat recovery system
Question and Answer IconNeed help?

Do you have a question about the Hitachi RAS-8FSXNS2E and is the answer not in the manual?

Hitachi RAS-8FSXNS2E Specifications

General IconGeneral
BrandHitachi
ModelRAS-8FSXNS2E
CategoryHeat Pump
LanguageEnglish

Summary

General Information

General Notes

General notes regarding publication use, product improvement, and errata.

Applied Symbols

Explanation of symbols used to indicate safety-critical situations and warnings.

Product Guide

Guide to understanding the model naming convention and product identification.

Product List

List of available models, their types, power supply, and cabinet sizes.

Combination of Base Units

Details on base unit combinations for different series and capacities.

Name of Parts

Cabinet Size S

Identification and labeling of parts within the S cabinet size unit.

Cabinet Size M

Identification and labeling of parts within the M cabinet size unit.

Cabinet Size L

Identification and labeling of parts within the L cabinet size unit.

Piping Work and Refrigerant Charge

Connection Kit Selection

Guidance on selecting the correct piping connection kits for various unit combinations.

Pipe Size Selection

Instructions and charts for selecting appropriate refrigerant pipe diameters.

Pipe Connection

Detailed steps and precautions for connecting refrigerant pipes, including tightening torques.

Connection Scenarios

Illustrative examples of piping connection scenarios for 2-pipe and 3-pipe systems.

Air-Tight Test

Procedures for tightening stop valves and conducting air-tight tests for leak detection.

Drain Piping

Condensation Drainage System

Information on condensation build-up in heating mode and drainage requirements.

Installation Position of the Optional Drainage Kit DBS-TP10A

Details on the installation position and components of the optional drainage kit.

Electric Wiring

General Information

Safety precautions and general information before starting electrical wiring work.

General Verifications

Checks for electrical components, supply voltage, and potential operational issues.

Setting of the DSW Switches on PCB1

Guide to setting DIP switches (DSW) and buttons on the PCB for unit configuration.

Commissioning

Preliminary Checks

Verification of refrigerant pipes, cables, unit settings, and electrical resistance before operation.

Carry out the Test Run

Procedure for performing the test run on indoor units and checking system conformity.

Related product manuals