Setting up the MIWI350 Device
02
Release the door latches of
the device one at a time, and
open the door of the device
Install UMB
on Instrument Drive
gas meter
(if applicable)
3
Route the pulse input/output cables
through the glands (if applicable)
04
3
01
0
05
Install the temperature probe to the
pipeline and tighten the nut to avoid
leakage (if applicable)
Route the external power cable
through the 05 gland and connect
to power terminal block
03
05
04