Procedure to safely open the inverter's wiring box cover for access to terminals.
Detailed steps for connecting photovoltaic (PV) cables to the inverter terminals.
Instructions for securely connecting battery cables to the inverter's battery terminals.
Guidance on connecting AC cables, including grid and generator connections.
Steps for connecting communication cables for monitoring and control systems.
Procedure for establishing wireless communication using 4G or Wi-Fi modules.
Steps for connecting the inverter to a network using an Ethernet cable.
Guide to acquiring and accessing the Hoymiles Installer mobile application.
Steps to connect the installer's device to the DTS unit's Wi-Fi network.
Process for configuring the DTS to connect to the home router's Wi-Fi network.
Checking the DTS indicator light for successful network connection confirmation.
Setting up grid parameters and identifying meter locations within the system.
Specifying the type of generator (PV or Diesel) connected to the GEN port.
Executing a comprehensive self-check to verify all system components are connected and functioning.