EasyManua.ls Logo

HP 240 G2 - Page 3

HP 240 G2
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tabulator: Nathan Ho
EL-MF877-00 Page 3
Template Revision B
PSG instructions for this template are available at EL-MF877-01
Work Instructs
Document No. :Disassembly WI Step : 1
Name :Get Battery
Date : 2013-11-13
Fixture list(Fixture standard) Qty Fixture list(Fixture standard) Qty
Philip #1 1
Point for attention: If finding some defects, notice the gaffer and assess.
Step:
1. Remove Batter pack.
2. Loosen screws in D cover,

Other manuals for HP 240 G2

Related product manuals