●
Air Purges (Setup Printheads)
●
Aerosol foam protector
Line Sensor Assembly on page 298, step 6
●
Carriage Assembly (with Encoder sensor)
Carriage on page 283 (does not include PCA nor
Cutter)
●
Ink Supply Tubes and Trailing Cable
Ink Supply Tubes and Trailing Cable on page 299
●
Tubes retaining clip
Cover, Top on page 230, step 7
●
Scraper Assembly and Absorber Foams
Removal of the Service Station Scraper on page 248
●
Scan-Axis Motor
Scan-Axis Motor on page 321
●
Belt Assembly
Belt Assembly on page 339
You must also clean the holes in the Service Station which are located under the Maintenance
Cartridge and check that the Aerosol Fan is functioning correctly.
Preventive Maintenance Kit #2
This Preventive Maintenance Kit #2 contains the following components:
●
Aerosol Filter
Service Station on page 244
●
SVS Aerosol Fan assembly ROHS
Service Station on page 244
●
Ink Absorber
See User’s Guide
●
Line Sensor
Line Sensor Assembly on page 298
●
Encoder Strip
Encoder Strip and Encoder Sensor on page 294
You must also clean the holes in the Service Station which are located under the Maintenance
Cartridge and check that the Aerosol Fan is functioning correctly.
472 Chapter 11 Preventive maintenance ENWW