Hardware options installation 57
IMPORTANT: When either optional I/O expansion board is installed in a two-processor
configuration, processor 2 and the I/O enabler must be installed.
1. Power down the server (on page 25).
2. Extend the server from the rack (on page 25).
3. Remove the access panel (on page 26).
4. Release the latches on the release lever.
5. Lower the handle, and then extend the processor memory drawer from the server until the release
latches catch.