Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:Auditor:
Stanley Chen
NPSU-PPE
1. Disassembly Fan cable connector on M/B
(Fig. 2)
2. Loosen thermal screw *4 (Fig.1)
Torque : 2.5 ± 0.2 Kgf.cm
Disassembly thermal module
7(1/1)
0.10
2016/6/29
Fig.1
Fig.2
1
3
4
2
FAN CNTR
T15 electrical screw driver 1
Fig.3