Notes : If finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : Slice ODD FA Disassembly SOP Station :
Operation name : Ver. : Date :
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Step:
Issue Dept.:
Auditor
Stanley Chen
NPSU-PPE
Disassembly Bottom case
1(1/1)
1. Loosen bottom case screw *4 (Fig.1)
Torque:2.5 ± 0.2 Kgf.cm
2. Disassembly bottom case(6070B1044001),
and put it in the box
Fig.1
1
2
4
3
Cross electrical screwdriver #1 1
0.10
2016/6/29
Fig. 2